Opportunity brief
Closing date not statedITT - Swindon Archive Decarbonisation Design Team (UID 320)
Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3). The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind. The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity. A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care. Based on the information provided, Historic England's preferred option currently involves: • Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions. • Rationalisation of archive environmental zones to improve operational efficiency. • Fabric improvements to enhance thermal performance and airtightness. • Fire safety upgrades and associated building works. • Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth. Scope of Services The appointed design team will be required to lead the project through: RIBA Stage 3 – Spatial Coordination Including but not limited to: • Review and validation of the completed RIBA Stage 2 outputs. • Development of the preferred design solution. • Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions. • Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations. • Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design. • Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios. • Planning application preparation and submission. • Cost planning and value management exercises. • Development of a robust whole-life cost and carbon assessment. • Stakeholder engagement and workshop facilitation. • Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.
- Other sectors
- Public sector
- United Kingdom

- Buyer / issuer
- Historic England
- Sector
- Other sectors
- Country / region
- United Kingdom
- Public or private
- Public sector
- Closing date
- Not stated
- Closing date not stated
- Estimated value
- £149k
- GBP
- Submission method
- Via the buyer's portal, linked from Find a Tender
- Tender number
- P/REF 00000632
- Status
- Active
Scope summary
Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3). The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind. The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity. A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care. Based on the information provided, Historic England's preferred option currently involves: • Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions. • Rationalisation of archive environmental zones to improve operational efficiency. • Fabric improvements to enhance thermal performance and airtightness. • Fire safety upgrades and associated building works. • Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth. Scope of Services The appointed design team will be required to lead the project through: RIBA Stage 3 – Spatial Coordination Including but not limited to: • Review and validation of the completed RIBA Stage 2 outputs. • Development of the preferred design solution. • Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions. • Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations. • Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design. • Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios. • Planning application preparation and submission. • Cost planning and value management exercises. • Development of a robust whole-life cost and carbon assessment. • Stakeholder engagement and workshop facilitation. • Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.
Category: services
Key requirements
- Procurement method: Competitive flexible procedure
- Briefing session: Not captured. Check the original notice before relying on this.
- Eligibility and evaluation: set out in the tender documents. Check mandatory returnables, registrations and scoring before you commit.
Required documents
- Notice documentOpen (opens the source site)
Important dates
- Published
- 09 Oct 2026
- First seen by Atlas
- 10 Oct 2026
- Briefing session
- Not captured. Check the original notice before relying on this.
- Submission deadline
- Not stated
Commercial snapshot
- Estimated value
- £149k
- Contract type
- Competitive flexible procedure
- Category
- services
- Source
- UK Find a Tender
How ABM can help
- Manage the Bid: A structured response, from the opportunity decision to the final submission.
- Develop the Response: Clear writing, considered production and approved material ready for reuse.
- Build Bid Capability: Practical support that strengthens how your business prepares and responds.
Live data from Atlas Tender Intelligence, gathered from official procurement portals and refreshed daily. Always confirm details on the original notice.
Related opportunities
View all in United Kingdom| Tender / opportunity | Issuer / buyer | Region | Closing date | Action |
|---|---|---|---|---|
| NRW/30295 Norfolk Economic Study Ref NRW/30295 | Norwich City Council | United Kingdom | 14 Nov 2026 Closes in 7 days | View brief |
| Norfolk Strategic Flood Risk Assessment Ref ocds-h6vhtk-078340 | Norwich City Council | United Kingdom | 14 Nov 2026 Closes in 7 days | View brief |
| ITT - Recruitment Applicant Tracking System - UID 390M Ref PREF 00000639 | Historic England | United Kingdom | 14 Nov 2026 Closes in 7 days | View brief |
- Closes in 7 dayspublic
NRW/30295 Norfolk Economic Study
Norwich City Council
United KingdomCloses 14 Nov 2026£95k - Closes in 7 dayspublic
Norfolk Strategic Flood Risk Assessment
Norwich City Council
United KingdomCloses 14 Nov 2026£35k - Closes in 7 dayspublic
ITT - Recruitment Applicant Tracking System - UID 390M
Historic England
United KingdomCloses 14 Nov 2026£140k